Frequently Asked Questions?

505 State Street

  • How is the All-Electric building different?

    Serving as a model for green living, 505 State Street replaces all functions typically run by natural gas with electricity. All kitchens, for example, are equipped with induction cooktops and each unit has a heat-pump dryer. Base-building systems, like hot water heating and HVAC, are also entirely electric, eliminating carbon emissions from homes and across the building. Eliminating gas usage and building more efficient apartments improves air quality for residents, and helps reduce the effects of climate change.

  • When will the 505 State Street amenities be complete?

    Amenities are expecting completion by this Spring/Summer 2024. The gym as well as other specific amenities will be available sooner and be publicly released to residents as they become available.

  • Will residents of the phase 2 future building share 505’s amenities?

    There is currently no plan for these two buildings to share amenities.

The Alloy Block

  • How do you gain admission to PS 456, the new elementary school?

    PS 456 is a brand-new borough wide public elementary school that is focused on project-based learning with a focus on social justice. It also has a Spanish English Dual language program. The building features a play yard on the roof, a gymnasium and an auditorium as well as an arts and music room. The first Pre-K and Kindergarten class will begin Fall 2024 year and will add a grade up to 5th each consecutive year. You can find out more here PS 456 (15K456) - NYC MySchools.

  • Tell me more about KGIA and it's new facility.

    The Khalil Gibran International Academy (KGIA) is a New York City public school with a particular focus on both English and Arabic languages and culture. It is open to all students throughout the city and will be moving into a brand new facility for the 2024-2025 school year. The new facility features art and music classrooms, library, an outdoor terrace and a full size basketball court on the top floor.

  • When will the future construction of Phase 2 be built?

    Phase 2 of The Alloy Block includes a mixed-use development with commercial and residential development and is anticipated to begin construction in 2025 with completion in mid 2028.

  • Will the phase 2 construction block my views?

    The tower that will be constructed is located on the western portion of the block and adjacent to the schools. West facing apartments will only have partial views blocked.

  • Will residents of the phase 2 future building share 505’s amenities?

    There is currently no plan for these two buildings to share amenities.